Contact Us:  855-335-6442  |  sales@saberlogic.com

Laser Cutting / Welding Automatic Run Calculations for Infor VISUAL ERP by SaberLogic

ERP Compatibility

Infor® VISUAL® Manufacturing ERP / Infor® VISUAL® Enterprise ERP / Infor® 10 ERP Express

Pricing

Please contact us for pricing

Disclaimer

VISUAL is a registered trademark of Infor.

Laser Cutting / Welding Automatic Run Calculations

This macro for Infor VISUAL© Manufacturing / Infor10 ERP Express is designed to auto-calculate the run time of laser cutting and welding operations.  For laser cutting operations the calculation takes into consideration the material thickness, number of pierces, number of inches cut, and a material multiplier cross referencing a custom table that provides some standard values based on material thickness.  For welding operations the calculation takes into consideration the material type, type of welding, material thickness, and inches of welding cross referencing a custom table that provides some standard values based on the material, weld type, and thickness.

Description

Laser Cutting

The macro will watch for newly created operations where the resource ID is "LASER" and perform the following action:

  • It will gather (and validate) that you have provided values in the following fields:
    • USER_1: Material Thickness
    • USER_2: Number of Pierces
    • USER_3: Inches of Cut
    • USER_4: Material Multiplier
  • We will next gather the following values from a custom table using a lookup based on the material thickness (this custom table will be described later on):
    • Part Pierce Time
    • Part Cut Time
  • At this point the run time will be calculated like so:
    • Total Piercing Time = Number of Pieces * Part Pierce Time
    • Total Cutting Time = (Inches of Cut / Part Cut Time) * 60
    • Run = 3600 / ((Total Pierce Time + Total Cutting Time) * Material Multiplier)
    • Run Type = PCS/HR

Welding

The macro will watch for newly created operations where the resource ID is "WELD" and perform the following action:

  • It will gather (and validate) that you have provided values in the following fields:
    • USER_1: Material
    • USER_2: Type of Welding
    • USER_3: Inches of Thickness
    • USER_4: Inches of Weld
  • We will next gather the following values from a custom table using a lookup based on the material, type of welding, and inches of thickness (this custom table will be described later on):
    • Part Start Time
    • Part Weld Time
  • At this point the run time will be calculated like so:
    • Total Weld Time = (12 / Part Weld Time)
    • Run = Part Start Time + Total Weld Time
    • Run Type = PCS/HR
Contact SaberLogic now to learn more!

132 Main St., Wadsworth, OH 44281 USA
855.335.6442
sales@saberlogic.com

  Custom Development
Integration
Support
Consulting
  Custom Development
Integration
Support
Consulting
  Custom Development
Crystal Reports Viewer
Support
Consulting

saberlogic

 

Epicor ERP

 

Visual ERP

 

Crystal Reports

Copyright © 2002-2018 SaberLogic, Inc  |  Privacy Policy  |  Terms & Conditions  |  Site Map

Epicor® is a registered trademark of Epicor Software Corporation.
VISUAL is a registered trademark of Infor.